
【国外标准】 Standard Guide for Stakeholder Engagement on Environmental Risk Management and Climate
本网站 发布时间:
2024-02-28
开通会员免费在线看70000余条国内标准,赠送文本下载次数,单本最低仅合13.3元!还可享标准出版进度查询、定制跟踪推送、标准查新等超多特权!  
查看详情>>

适用范围:
5.1 Stakeholder engagement, in the climate vulnerability context, most often refers to the meaningful involvement of affected parties in planning or decision-making efforts in order to integrate their knowledge and values with a particular project’s more specialized knowledge and purpose. In turn, stakeholders are often broadly defined as those people who are affected by or can affect a decision and range from the “average” citizen to groups of highly interested or invested decision-makers.5.2 It is important that stakeholders understand the role they are invited to play in a public engagement program. This will help provide clarity to the process and help avoid misunderstandings. Stakeholder roles may naturally evolve over the period that they are engaged in a public process, and as transition occurs, it is wise to redefine these roles. When an advisory committee or partnership between public agencies is established, it is helpful to develop a charter or other memo of understanding that describes the roles and responsibilities of all involved.5.3 EPA’s Public Involvement Spectrum (2015)(6) can provide useful tools. Fig. 2 illustrates a spectrum of public involvement options that may be appropriate.FIG. 2 EPA Public Involvement Spectrum.Source: U.S. EPA’s Public Involvement Spectrum1.1 This guide provides a series of steps to develop and execute an effective stakeholder engagement process for a broad spectrum of environmental projects including, but not limited to, site remediation and brownfields development, as well as local and regional climate resiliency and climate vulnerability initiatives. This guide does not apply to broad programmatic initiatives.1.2 Effective stakeholder engagement in site remediation, brownfields redevelopment, habitat restoration, climate resiliency, climate vulnerability, and flood prevention and control projects requires a process that is based on mutual education, effective communication about the project and its impacts, identification of the interests that will be affected, and open discussion about how to address those interests to the extent that is possible. The General Accountability Office suggests that core principles and strategic approaches enhance stakeholder participation (GAO 2006)(1)2. The National Oceanic and Atmospheric Administration (NOAA) reported that stakeholders developed more robust mitigation measures that addressed multiple hazards when they integrated climate variability into vulnerability and risk assessments associated with flooding and other natural disasters in the East Bay area of California’s San Francisco Bay. (NOAA, 2021)(2).1.3 An effective stakeholder engagement process (see Fig. 1) can create benefits for large projects, including:3FIG. 1 Stakeholder Engagement ProcessSource: Eurofleets https://www.eurofleets.eu/stakeholders/1.3.1 Improved, sustainable outcomes, because the final project plan builds on local capacity and knowledge and considers local and regional issues that may require resolution in order to move forward.1.3.2 Shared understanding of perspectives, issues, challenges, alternatives, and how these influence the desired or necessary outcomes1.3.3 Credibility of and predictability for the project plan that comes from transparency1.3.4 Stakeholder support for the planning process through shared data, ideas, funding, and political support1.3.5 Strengthened relationships among affected parties for moving forward on the project.1.3.6 Satisfying any legally-required public notice and participation requirements.1.3.6.1 Stakeholder engagement should not be confused with the public participation requirements of the National Environmental Policy Act codified in 40 CFR §6.203. because NEPA potentially does not involve stakeholders until later in the project development process. In addition, NEPA's public participation process is not as flexible as that described in this guide.1.3.7 Welp and Stoll-Kleeman (2006)(3) reported additional benefits of engaging stakeholders and affected parties in decisions regarding natural resources management. These benefits include:1.3.7.1 Enhanced understanding,1.3.7.2 Developing new options,1.3.7.3 Decreasing hostility among participants through improved dialog and discussion,1.3.7.4 Enlightening legal policy makers,1.3.7.5 Producing competent, fair, and optimized solutions,1.3.7.6 Accelerating the decision-making process.1.4 In order to identify prospective stakeholders, ISO 26000 clause 5.3.2 suggests that an organization should ask the following questions:1.4.1 To whom does the organization have legal obligations?1.4.2 Who might be positively or negatively affected by the organization’s decisions, activities, or anticipated outcomes?1.4.2.1 Mediators and facilitators are expected to be neutral parties.1.4.3 Who is likely to express opinions and concerns about the decisions and activities of the organization?1.4.4 Who has been involved in the past when similar concerns needed to be addressed?1.4.5 Who can help the organization address specific impacts?1.4.6 Who can affect the organization’s ability to meet its responsibilities?1.4.7 Who are the affected parties that would be disadvantaged if excluded from the engagement?1.5 Stakeholder prioritization criteria1.5.1 Identification of criteria to prioritize stakeholder engagement may be useful for some projects (Sharpe, 2021)(4). These criteria include, but are not limited to:1.5.1.1 Level of interest,1.5.1.2 Proximity, including nearby property owners,,1.5.1.3 Fairness,1.5.1.4 Magnitude of impact,1.5.1.5 Underrepresented and underserved populations,1.5.1.6 Probability of impact,1.5.1.7 Level of community influence,1.5.1.8 Cost, and1.5.1.9 Time to implement a proposed project plan.1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
标准号:
ASTM E3356-22
标准名称:
Standard Guide for Stakeholder Engagement on Environmental Risk Management and Climate
英文名称:
Standard Guide for Stakeholder Engagement on Environmental Risk Management and Climate标准状态:
Active-
发布日期:
-
实施日期:
出版语种:
- 推荐标准
- ASTM B1-13(2018) Standard Specification for Hard-Drawn Copper Wire
- ASTM B100-20 Standard Specification for Wrought Copper-Alloy Bearing and Expansion Plates and Sheets for Bridge and Other Structural Use
- ASTM B1002-16(2020) Standard Specification for Refined Indium
- ASTM B1003-16(2023) Standard Specification for Seamless Copper Tube for Linesets
- ASTM B1004-16(2022) Standard Practice for Contact Performance Classification of Electrical Connection Systems
- ASTM B1005-17(2023) Standard Specification for Copper-Clad Aluminum Bar for Electrical Purposes (Bus Bar)
- ASTM B1008-18 Standard Test Method for Stress-Strain Testing for Overhead Electrical Conductors
- ASTM B1010/B1010M-19 Standard Specification for Copper-Clad Steel Electrical Conductor for Tracer Wire Applications
- ASTM B1011/B1011M-22 Standard Specification for Cobalt Alloy Spring Wire
- ASTM B1013-22 Standard Specification for High Fluidity (HF) Zinc-Aluminum Alloy Thin Wall Die Castings
- ASTM B1014-20 Standard Specification for Welded Copper and Copper Alloy Condenser and Heat Exchanger Tubes with a Textured Surface(s)
- ASTM B1019-21 Standard Test Method for Determination of Surface Oxides on Copper Rod(for Electrical Purposes)
- ASTM B1020/B1020M-22 Standard Specification for Seamless Nickel Alloy Mechanical Tubing and Hollow Bar
- ASTM B1021-21 Standard Test Method for Peel Resistance of Metal Sheets Joined by High Strength Bonds
- ASTM B1022-22 Standard Specification for Zinc-Aluminum-Magnesium Alloys in Ingot Form for Coating Steel Sheet by the Hot-Dip Process